Saturday, February 4, 2017

Some progress on the built in

Did a bit of work on the built in today.  Added a little shelf above the fridge spot for bread or small items.  Instead of just buying some new plywood or something, a couple shelves from one of the old cabinets upstairs were repurposed into a new shelf.  They didn't fit perfectly tight, but I am leaving the gaps so some air can circulate behind the fridge for cooling.  Obviously this isn't done, but it's getting there.

This stamp was on one of the shelves.  I turned this piece upside down so when I paint the shelving it's preserved for the future:

Kitchen side


Den side:


No comments:

Post a Comment